[ad_1]

A significant Watford highway is ready to close for 3 weekends to ensure that restore works to happen. Hertfordshire County Council confirmed that highway closures because of restore and enchancment works to River Colne Bridge in Bushey.

Components of the outdated bridge construction and protecting coatings can be eliminated and there can be concrete repairs to the bridge construction. Waterproofing repairs on the ends of the bridge deck are additionally anticipated to happen, in addition to portray the bridge.

Resurfacing to the highway and bridge can also be anticipated to happen as a part of the enhancements, in addition to eradicating close by bushes to ensure that the works to happen. On account of the enhancements, quite a lot of roads can be shut.

READ MORE: The latest traffic and travel news in Hertfordshire

A two means non permanent site visitors mild system can be in place on Otterspool Lane, Bushey between Could 16 till June 24. A weekend highway closure of the A41 Colne Manner, Bushey may even be shut between 10pm on Friday, June 17 to 6am on Monday, June 20.

The A41 Colne Manner, Bushey may even be shut between 10pm on Friday, June 24 to 6am on Monday, June 27. One other weekend highway closure is anticipated on the A41 Colne Manner the next weekend too, between 10pm on Friday, July 1 to 6am on Monday, July 4.

Listed here are all of the highway closures

  • 16 Could – 24 June 2022 – two means non permanent site visitors lights on Otterspool Lane, Bushey
  • 17 – 20 June 2022, between Friday 10pm – Monday 6am – weekend highway closure of the A41 Colne Manner, Bushey
  • 24 – 27 June 2022, between Friday 10pm – Monday 6am – weekend highway closure of the A41 Colne Manner, Bushey
  • 1 – 4 July 2022, between Friday 10pm – Monday 6am – weekend highway closure of the A41 Colne Manner, Bushey

Learn how you can get extra information from HertsLive straight to your inbox without spending a dime HERE.



[ad_2]

Source link