[ad_1]

The AA stated it acquired reviews of a collision on Gatwick Street in Crawley by Crawley Avenue at round 2.40pm.

Newhaven Swing Bridge is ready to open at 5.20pm – which might disrupt motorists on the A259 in each instructions.

A spokesperson from the Newhaven Port Authority stated: β€œThe typical time the street is closed for a swing bridge opening is 10 minutes and the typical variety of swing bridge openings over the previous 5 years (2016 to 2020) is 11 per thirty days.”

Site visitors inventory picture

Emergency roadworks are being carried on the A259 in each instructions between the A27 and the A269 Bexhill West from 8pm-11.59pm tonight.

General, roads throughout Sussex are comparatively quiet this night.

[ad_2]

Source link